Business

Downtown revitalization project phase 3 updates for the week of Aug. 6

(WARRENSBURG, Mo.)—The east entry to Mopac Alley (the one-way alley off Holden Street that runs parallel to the railroad tracks), and the entrance to the Chamber of Commerce’s parking lot off Holden Street will both be closed until further notice.

Pine Street and Bodies Alley will be open Thursday, Aug. 9 through Saturday, Aug. 11. West Pine Street will be closed to install Petro Mate Sunday, Aug. 12.

Surface asphalt installation and imprinting asphalt installation will begin Monday, Aug. 13. West Pine Street and Bodies Alley will be closed. West Pine Street from Holden Street to Washington Street will be closed for striping Tuesday, Aug. 14.

The walkway alley and stairs to the Culton Street parking lot will be closed to through traffic Tuesday, Aug. 14 through Friday, Aug. 17. Bodies Alley and the center area of West Pine street will be closed for asphalt imprinting and color coating Wednesday, Aug. 15 through Friday, Aug. 17. Traffic may be allowed onto West Pine Street from Holden and Washington streets pending asphalt cure time, but will remain closed to through traffic.

All of West Pine Street and Bodies Alley will be open Saturday, Aug. 18.

An informational meeting has been scheduled for Wednesday, Aug. 15 at 8:30 a.m. at 111 N Holden Street. For more information, contact Julie Turnipseed at wmainst@embarqmail.com or 660-429-3988.

Leave a Reply

Your email address will not be published. Required fields are marked *